The Process
Benefits
Case Histories
Members
Faq's
Library
Members Area
 

 

To download images...
when the images have loaded

PC: RIGHT CLICK and SAVE AS or DRAG to desired folder
MAC: DRAG to desired folder

Stabilising machine mixing the lime into the clay soil.
Courtesy of Geofirma Soils Engineering

Close up of the mixed and pulverised clay.
Courtesy of Geofirma Soils Engineering

Spread lime ready to be mixed into the wet clay alongside treated clay.
Courtesy of Geofirma Soils Engineering

Clay before and after lime treatment.
Courtesy of Geofirma Soils Engineering

Tractor drawn spreader in use.

Spreader in use at Shinewater School, Eastbourne.
Courtesy of McArdle Stabilisation

Tractor drawn integrated spreader and mixer unit.
Courtesy of Con-Form Contracting

Tractor drawn integrated spreader and mixer unit.
Courtesy of Con-Form Contracting

Spreader and Wirtgen rotovator in use
Courtesy of Beach Stabilisation

Tracked spreader in use at Stoke
Courtesy of Beach Stabilisation

Tracked spreader in use on Lancaster Sea Defence work, showing soil before treatment
Courtesy of Beach Stabilisation

Wirtgen rotovator in use, showing material spread with lime and after stabilisation
Courtesy of Beach Stabilisation

 

Soil before stabilisation at Temple Sowerby by pass
Courtesy of Beach Stabilisation

Lime being mixed with a Wirtgen rotovator at Temple Sowerby by pass. Water is being added through the mixer hood.
Courtesy of Beach Stabilisation

Lime being mixed with a Wirtgen rotovator at Temple Sowerby by pass. Roller compacted stabilised soil in the foreground.
Courtesy of Beach Stabilisation

 


  © 2005 Britpave           Terms of Use                    Site by: Marksman International